1
/
von
8
PayPal, credit cards. Download editable-PDF and invoice in 1 second!
NY/T 1420-2007 English PDF (NY/T1420-2007)
NY/T 1420-2007 English PDF (NY/T1420-2007)
Normaler Preis
$130.00 USD
Normaler Preis
Verkaufspreis
$130.00 USD
Grundpreis
/
pro
Verfügbarkeit für Abholungen konnte nicht geladen werden
Delivery: 2 working-hours manually (Sales@ChineseStandard.net)
Need delivered in 3-second? USA-Site: NY/T 1420-2007
Get Quotation: Click NY/T 1420-2007 (Self-service in 1-minute)
Historical versions (Master-website): NY/T 1420-2007
Preview True-PDF (Reload/Scroll-down if blank)
NY/T 1420-2007: General Code for Acceptance of Constructional Quality of Greenhouse
NY/T 1420-2007
NY
AGRICULTURAL INDUSTRY STANDARD
OF THE PEOPLE’S REPUBLIC OF CHINA
ICS 65.040.30
B 04
General code for acceptance of constructional quality
of greenhouse
ISSUED ON: JUNE 14, 2007
IMPLEMENTED ON: SEPTEMBER 01, 2007
Issued by: Ministry of Agriculture of PRC
Table of Contents
Foreword ... 3
1 Scope ... 4
2 Normative references ... 4
3 Terms and definitions ... 5
4 Content and procedures for acceptance of constructional quality of
greenhouse ... 5
5 Requirements and organization of acceptance of construction (installation)
quality for greenhouse ... 5
6 Requirements and organization of operating performance acceptance of
greenhouse projects ... 7
7 Quality warranty and training of use management personnel training for
greenhouse projects ... 8
8 Acceptance documents of greenhouse project quality ... 9
Appendix A (Normative) Details of divisional (sub-divisional) work and item work
of construction (installation) quality acceptance of greenhouse ... 12
General code for acceptance of constructional quality
of greenhouse
1 Scope
This standard specifies the content, procedures, general requirements for the
acceptance of constructional quality of greenhouse, as well as the documents
to be submitted for the completion acceptance, the requirements for quality
warranty, the training of use and management personnel after completion.
This standard applies to the engineering quality acceptance of greenhouses,
which are used for production and scientific research. Other greenhouses may
refer to this standard.
2 Normative references
The provisions in following documents become the provisions of this Standard
through reference in this Standard. For the dated references, the subsequent
amendments (excluding corrections) or revisions do not apply to this Standard;
however, parties who reach an agreement based on this Standard are
encouraged to study if the latest versions of these documents are applicable.
For undated references, the latest edition of the referenced document applies.
GB 50204-2002 Code for acceptance of constructional quality of concrete
structures
GB 50242-2002 Code for acceptance of construction quality of water supply
drainage
GB 50300-2001 Unified standard for constructional quality acceptance of
building engineering
GB 50303-2002 Code of acceptance of construction quality of electrical
installation in building
GB/T 19165-2003 The structure and properties requirement for sunlight
greenhouse and plastic tunnel
NY/T 610-2002 Technical specification for solar energy greenhouse
NY/T 1145-2006 Technical code for design construction and acceptance of
greenhouse foundation
3 Terms and definitions
The terms and definitions, which are defined in GB 50300-2001, are applicable
to this standard.
4 Content and procedures for acceptance of
constructional quality of greenhouse
4.1 The constructional quality acceptance of greenhouse includes two parts:
constructional (installation) quality acceptance and operational performance
acceptance.
4.2 The construction (installation) quality acceptance of the greenhouse is first
carried out, according to the divisional and item works. After each divisional and
item work has passed the acceptance, organize the overall completion
acceptance of the constructional (installation) quality of the greenhouse.
Divisional and item works are divided, according to Appendix A of this standard.
4.3 The construction organization can deliver the greenhouse to the building
organization for trial operation, after the completion acceptance of the
greenhouse is qualified. The trial operation period is 1 year.
4.4 The operating performance acceptance shall be completed, during the trial
operation of the greenhouse.
4.5 The operating performance acceptance of the greenhouse project includes
lighting performance, heat preservation (airtight) performance, ventilation and
cooling performance, heating performance, waterproof performance, etc.
5 Requirements and organization of acceptance of
construction (installation) quality for greenhouse
5.1 Requirements
5.1.1 The acceptance of construction (installation) quality of greenhouse shall
comply with the provisions of 3.0.1 ~ 3.0.3 in GB 50300-2001.
5.1.2 The construction quality of the greenhouse foundation shall meet the
relevant provisions of NY/T 1145-2006.
5.1.3 The construction (installation) quality of the greenhouse's reinforced
concrete framework, columns, beams, roof slabs, etc. shall meet the relevant
6 Requirements and organization of operating
performance acceptance of greenhouse projects
6.1 Requirements
6.1.1 The operating performance of solar greenhouses and plastic
greenhouses shall meet the requirements of GB/T 19165-2003 and NY/T 610-
2002.
6.1.2 The operating performance of the multi-span greenhouse shall meet the
requirements, which are stipulated in the contract, between the construction
organization and the building organization. It shall be checked and accepted, in
accordance with the contract agreement or the method proposed by the on-site
experts.
6.2 Organization of acceptance
6.2.1 The acceptance of greenhouse's operation performance shall be
organized by the building organization; it shall entrust the relevant qualified
quality inspection organizations, to conduct inspection and quality assessment.
6.2.2 The testing of the greenhouse's operating performance can be carried out
in a specified period of time OR on-site in real-time. Generally, the testing of
greenhouse heating and heat preservation performance shall be carried out, in
the coldest month during the greenhouse operation. The testing of cooling
performance shall be carried out, in the hottest month during the greenhouse
operation. However, the specific time for testing shall be agreed in advance.
6.2.3 When the greenhouse's operation performance fails in the testing, the
building organization shall organize the testing organization, construction
organization, design organization, equipment supplier, to jointly analyze the
reasons for the failure; propose modification or remedial plans; rectify the
greenhouse project; propose the analysis and rectification report of
performance and quality inspections.
6.2.4 If any organizations related to the greenhouse's operation performance
disagrees with the test results, the building organization may request the quality
inspection organization to conduct a re-inspection. If the testing result maintains
the previous testing conclusion, it will be the final testing result. Otherwise, the
building organizations may entrust other testing organizations to test, OR
request a more authoritative testing agency to conduct testing and arbitration.
6.2.5 After the testing of greenhouse's operation performance is completed, the
testing organization shall submit a test report to the building organization.
6.2.6 If the acceptance of greenhouse's operation performance is qualified
within the specified time, the greenhouse's constructional quality will be
deemed qualified.
7 Quality warranty and training of use management
personnel training for greenhouse projects
7.1 When the construction organization submits the application report for the
completion acceptance of the greenhouse project, to the building organization,
it shall issue the quality warranty certificate of the greenhouse project to the
building organization. It shall specify the warranty scope, warranty period,
warranty responsibility of the greenhouse, in the quality warranty certificate.
7.2 The warranty period of the greenhouse project is calculated, from the date
when the construction (installation) quality is completed and accepted.
7.3 If the greenhouse project needs to continue to be used, after its reasonable
service life, the building organization shall entrust the survey and design
organizations, which have the corresponding qualification level, AND the
relevant greenhouse project quality inspection organization, for appraisal; take
measures such as reinforcement and maintenance, according to the appraisal
results; redefine the service life.
7.4 Under normal conditions of use, the minimum warranty period for
greenhouse projects is:
- The minimum warranty period for the foundation and main structure of the
greenhouse is 10% of the reasonable service life. The reasonable service
life is stipulated in the design documents. Generally, the service life of the
prefabricated hot-dip galvanized steel pipe skeleton plastic greenhouse and
the solar greenhouse, shall not be less than 5 years. The service life of
plastic film multi-span greenhouses shall not be less than 10 years. The
service life of glass greenhouses and polycarbonate greenhouses shall not
be less than 15 years.
- Heating system, water supply and drainage pipes, electrical pipelines,
equipment installation: 2 years.
- Fans, wet curtains, seedbeds, computer control equipment, irrigation
equipment, window openers, curtain pullers, roller blinds (quilt) machines:
1 year.
- Glass, polycarbonate board, plastic film, sunshade net, insect-proof net,
outdoor thermal insulation quilt of solar greenhouse: 1 year.
installation and construction drawings;
5) The as-built drawing of the greenhouse heating system, including the
floor plan, the system drawing, the installation joint drawing of the
heating system;
6) Greenhouse electrical as-built drawings, including lighting plan, power
plan, system diagram, electrical control schematic diagram;
7) As-built drawing of greenhouse equipment, including: seedbed layout
drawing and its installation joint diagram, layout and installation drawing
of ventilation and cooling equipment (including window opening
mechanism, exhaust fan, circulation fan, wet curtain system, etc.),
layout and installation drawing of shading and heat preservation system
equipment (including external shading, internal thermal insulation,
external thermal insulation, etc.).
b) Construction acceptance records of concealed projects, including the
detailed drawings of foundation, base, embedded pipelines, embedded
parts, etc.;
c) Product manuals (including main technical performance indicators, etc.),
implementation standards, product qualification certificates, quality
guarantees for main equipment and materials;
d) Greenhouse operating instructions (including safe operation procedures
and other operation management systems);
e) Training records of greenhouse operation and management personnel.
8.2 When the greenhouse project is completed and accepted, the supervision
organization shall submit the following documents, to the building organization,
according to the construction content of the greenhouse:
- Preliminary acceptance report of greenhouse construction (installation)
project, including the acceptance record documents of construction method,
construction quality, construction data, each divisional (sub-divisional), item
work etc.;
- Assessment report of greenhouse construction (installation) project quality.
8.3 After the completion and acceptance of the greenhouse project, the
supervision organization shall submit the following documents to the building
organization:
- Summary of supervision work;
Need delivered in 3-second? USA-Site: NY/T 1420-2007
Get Quotation: Click NY/T 1420-2007 (Self-service in 1-minute)
Historical versions (Master-website): NY/T 1420-2007
Preview True-PDF (Reload/Scroll-down if blank)
NY/T 1420-2007: General Code for Acceptance of Constructional Quality of Greenhouse
NY/T 1420-2007
NY
AGRICULTURAL INDUSTRY STANDARD
OF THE PEOPLE’S REPUBLIC OF CHINA
ICS 65.040.30
B 04
General code for acceptance of constructional quality
of greenhouse
ISSUED ON: JUNE 14, 2007
IMPLEMENTED ON: SEPTEMBER 01, 2007
Issued by: Ministry of Agriculture of PRC
Table of Contents
Foreword ... 3
1 Scope ... 4
2 Normative references ... 4
3 Terms and definitions ... 5
4 Content and procedures for acceptance of constructional quality of
greenhouse ... 5
5 Requirements and organization of acceptance of construction (installation)
quality for greenhouse ... 5
6 Requirements and organization of operating performance acceptance of
greenhouse projects ... 7
7 Quality warranty and training of use management personnel training for
greenhouse projects ... 8
8 Acceptance documents of greenhouse project quality ... 9
Appendix A (Normative) Details of divisional (sub-divisional) work and item work
of construction (installation) quality acceptance of greenhouse ... 12
General code for acceptance of constructional quality
of greenhouse
1 Scope
This standard specifies the content, procedures, general requirements for the
acceptance of constructional quality of greenhouse, as well as the documents
to be submitted for the completion acceptance, the requirements for quality
warranty, the training of use and management personnel after completion.
This standard applies to the engineering quality acceptance of greenhouses,
which are used for production and scientific research. Other greenhouses may
refer to this standard.
2 Normative references
The provisions in following documents become the provisions of this Standard
through reference in this Standard. For the dated references, the subsequent
amendments (excluding corrections) or revisions do not apply to this Standard;
however, parties who reach an agreement based on this Standard are
encouraged to study if the latest versions of these documents are applicable.
For undated references, the latest edition of the referenced document applies.
GB 50204-2002 Code for acceptance of constructional quality of concrete
structures
GB 50242-2002 Code for acceptance of construction quality of water supply
drainage
GB 50300-2001 Unified standard for constructional quality acceptance of
building engineering
GB 50303-2002 Code of acceptance of construction quality of electrical
installation in building
GB/T 19165-2003 The structure and properties requirement for sunlight
greenhouse and plastic tunnel
NY/T 610-2002 Technical specification for solar energy greenhouse
NY/T 1145-2006 Technical code for design construction and acceptance of
greenhouse foundation
3 Terms and definitions
The terms and definitions, which are defined in GB 50300-2001, are applicable
to this standard.
4 Content and procedures for acceptance of
constructional quality of greenhouse
4.1 The constructional quality acceptance of greenhouse includes two parts:
constructional (installation) quality acceptance and operational performance
acceptance.
4.2 The construction (installation) quality acceptance of the greenhouse is first
carried out, according to the divisional and item works. After each divisional and
item work has passed the acceptance, organize the overall completion
acceptance of the constructional (installation) quality of the greenhouse.
Divisional and item works are divided, according to Appendix A of this standard.
4.3 The construction organization can deliver the greenhouse to the building
organization for trial operation, after the completion acceptance of the
greenhouse is qualified. The trial operation period is 1 year.
4.4 The operating performance acceptance shall be completed, during the trial
operation of the greenhouse.
4.5 The operating performance acceptance of the greenhouse project includes
lighting performance, heat preservation (airtight) performance, ventilation and
cooling performance, heating performance, waterproof performance, etc.
5 Requirements and organization of acceptance of
construction (installation) quality for greenhouse
5.1 Requirements
5.1.1 The acceptance of construction (installation) quality of greenhouse shall
comply with the provisions of 3.0.1 ~ 3.0.3 in GB 50300-2001.
5.1.2 The construction quality of the greenhouse foundation shall meet the
relevant provisions of NY/T 1145-2006.
5.1.3 The construction (installation) quality of the greenhouse's reinforced
concrete framework, columns, beams, roof slabs, etc. shall meet the relevant
6 Requirements and organization of operating
performance acceptance of greenhouse projects
6.1 Requirements
6.1.1 The operating performance of solar greenhouses and plastic
greenhouses shall meet the requirements of GB/T 19165-2003 and NY/T 610-
2002.
6.1.2 The operating performance of the multi-span greenhouse shall meet the
requirements, which are stipulated in the contract, between the construction
organization and the building organization. It shall be checked and accepted, in
accordance with the contract agreement or the method proposed by the on-site
experts.
6.2 Organization of acceptance
6.2.1 The acceptance of greenhouse's operation performance shall be
organized by the building organization; it shall entrust the relevant qualified
quality inspection organizations, to conduct inspection and quality assessment.
6.2.2 The testing of the greenhouse's operating performance can be carried out
in a specified period of time OR on-site in real-time. Generally, the testing of
greenhouse heating and heat preservation performance shall be carried out, in
the coldest month during the greenhouse operation. The testing of cooling
performance shall be carried out, in the hottest month during the greenhouse
operation. However, the specific time for testing shall be agreed in advance.
6.2.3 When the greenhouse's operation performance fails in the testing, the
building organization shall organize the testing organization, construction
organization, design organization, equipment supplier, to jointly analyze the
reasons for the failure; propose modification or remedial plans; rectify the
greenhouse project; propose the analysis and rectification report of
performance and quality inspections.
6.2.4 If any organizations related to the greenhouse's operation performance
disagrees with the test results, the building organization may request the quality
inspection organization to conduct a re-inspection. If the testing result maintains
the previous testing conclusion, it will be the final testing result. Otherwise, the
building organizations may entrust other testing organizations to test, OR
request a more authoritative testing agency to conduct testing and arbitration.
6.2.5 After the testing of greenhouse's operation performance is completed, the
testing organization shall submit a test report to the building organization.
6.2.6 If the acceptance of greenhouse's operation performance is qualified
within the specified time, the greenhouse's constructional quality will be
deemed qualified.
7 Quality warranty and training of use management
personnel training for greenhouse projects
7.1 When the construction organization submits the application report for the
completion acceptance of the greenhouse project, to the building organization,
it shall issue the quality warranty certificate of the greenhouse project to the
building organization. It shall specify the warranty scope, warranty period,
warranty responsibility of the greenhouse, in the quality warranty certificate.
7.2 The warranty period of the greenhouse project is calculated, from the date
when the construction (installation) quality is completed and accepted.
7.3 If the greenhouse project needs to continue to be used, after its reasonable
service life, the building organization shall entrust the survey and design
organizations, which have the corresponding qualification level, AND the
relevant greenhouse project quality inspection organization, for appraisal; take
measures such as reinforcement and maintenance, according to the appraisal
results; redefine the service life.
7.4 Under normal conditions of use, the minimum warranty period for
greenhouse projects is:
- The minimum warranty period for the foundation and main structure of the
greenhouse is 10% of the reasonable service life. The reasonable service
life is stipulated in the design documents. Generally, the service life of the
prefabricated hot-dip galvanized steel pipe skeleton plastic greenhouse and
the solar greenhouse, shall not be less than 5 years. The service life of
plastic film multi-span greenhouses shall not be less than 10 years. The
service life of glass greenhouses and polycarbonate greenhouses shall not
be less than 15 years.
- Heating system, water supply and drainage pipes, electrical pipelines,
equipment installation: 2 years.
- Fans, wet curtains, seedbeds, computer control equipment, irrigation
equipment, window openers, curtain pullers, roller blinds (quilt) machines:
1 year.
- Glass, polycarbonate board, plastic film, sunshade net, insect-proof net,
outdoor thermal insulation quilt of solar greenhouse: 1 year.
installation and construction drawings;
5) The as-built drawing of the greenhouse heating system, including the
floor plan, the system drawing, the installation joint drawing of the
heating system;
6) Greenhouse electrical as-built drawings, including lighting plan, power
plan, system diagram, electrical control schematic diagram;
7) As-built drawing of greenhouse equipment, including: seedbed layout
drawing and its installation joint diagram, layout and installation drawing
of ventilation and cooling equipment (including window opening
mechanism, exhaust fan, circulation fan, wet curtain system, etc.),
layout and installation drawing of shading and heat preservation system
equipment (including external shading, internal thermal insulation,
external thermal insulation, etc.).
b) Construction acceptance records of concealed projects, including the
detailed drawings of foundation, base, embedded pipelines, embedded
parts, etc.;
c) Product manuals (including main technical performance indicators, etc.),
implementation standards, product qualification certificates, quality
guarantees for main equipment and materials;
d) Greenhouse operating instructions (including safe operation procedures
and other operation management systems);
e) Training records of greenhouse operation and management personnel.
8.2 When the greenhouse project is completed and accepted, the supervision
organization shall submit the following documents, to the building organization,
according to the construction content of the greenhouse:
- Preliminary acceptance report of greenhouse construction (installation)
project, including the acceptance record documents of construction method,
construction quality, construction data, each divisional (sub-divisional), item
work etc.;
- Assessment report of greenhouse construction (installation) project quality.
8.3 After the completion and acceptance of the greenhouse project, the
supervision organization shall submit the following documents to the building
organization:
- Summary of supervision work;
Share