Salt la informațiile despre produs
1 din 7

PayPal, credit cards. Download editable-PDF and invoice in 1 second!

GB 21347-2023 English PDF

GB 21347-2023 English PDF

Preț obișnuit $165.00 USD
Preț obișnuit Preț redus $165.00 USD
Vânzare Stoc epuizat
Delivery: 2 working-hours manually (Sales@ChineseStandard.net)
Need delivered in 3-second? USA-Site: GB 21347-2023
Get Quotation: Click GB 21347-2023 (Self-service in 1-minute)
Historical versions (Master-website): GB 21347-2023
Preview True-PDF (Reload/Scroll-down if blank)

GB 21347-2023: Norm of energy consumption per unit throughput of industrial silicon and magnesium
GB 21347-2023
GB
NATIONAL STANDARD OF THE
PEOPLE?€?S REPUBLIC OF CHINA
ICS 27.010
CCS F 01
Replacing GB 21347-2012, GB 31338-2014
Norm of Energy Consumption per unit Throughput of
Industrial Silicon and Magnesium
ISSUED ON: SEPTEMBER 08, 2023
IMPLEMENTED ON: OCTOBER 1, 2024
Issued by: State Administration for Market Regulation;
Standardization Administration of the People?€?s Republic of China.
Table of Contents
Foreword ... 3
1 Scope ... 4
2 Normative References ... 4
3 Terms and Definitions ... 4
4 Norm Level of Energy Consumption ... 5
5 Technical Requirements ... 5
6 Statistical Range and Calculation Method of Energy Consumption ... 5
Appendix A (Informative) Conversion Coefficients of Various Energy Sources to
Standard Coal ... 8
Appendix B (Informative) Conversion Coefficient to Standard Coal of Main Energy-
Consuming Working Fluid (in Energy Indifference Value) (Reference Value) ... 11
Foreword
This Document was drafted as per the rules specified in GB/T 1.1-2020 Directives for
Standardization ?€? Part 1: Rules for the Structure and Drafting of Standardizing Documents.
This Document replace GB 21347-2012 The Norm of Energy Consumption Per Unit Products
of Magnesium Metallurgical Enterprise, and GB 31338-2014 The Norm of Energy
Consumption Per Unit Products of Silicon Metal. Compared with GB 21347-2012 and GB
31338-2014, this Document has the major technical changes as follows besides the structural
adjustments and editorial modifications:
a) Change the advanced value, access value and limited value of the energy consumption
limit per unit product of industrial silicon and magnesium to level 1, level 2 and level 3
of the energy consumption limit level respectively; and change the energy consumption
limit level of industrial silicon and magnesium unit product value; add the classification
of the industrial silicon energy consumption limit level value according to the main
reducing agent (see Clause 4 of this Document; Clause 4 of GB 21347-2012 and Clause
4 of GB 31338-2014);
b) Delete the calculation principle (see 5.1 of GB 21347-2012 and 5.1 of GB 31338-2014);
c) Change the statistical range of comprehensive energy consumption per unit product of
industrial silicon and magnesium (see 6.1 of this Edition; 5.3 of GB 21347-2012 and 5.2
of GB 31338-2014);
d) Change the calculation method of comprehensive energy consumption per unit product
of industrial silicon and magnesium (see 6.2 of this Edition; 5.2 of GB 21347-2012 and
5.3 of GB 31338-2014);
e) Delete energy saving management and measures (see Clause 6 of GB 21347-2012 and
Clause 6 of GB 31338-2014).
Please note some contents of this Document may involve patents. The issuing agency of this
Document shall not assume the responsibility to identify these patents.
This Document was proposed by and under the jurisdiction of Standardization Administration
of People?€?s Republic of China.
The historical editions replaced by this Standard are as follows:
--- This Document was first-time published in 2008; first-time revised in 2012;
--- It is the second-time revised hereby; this revision combines the contents of GB 31338-2014
The Norm of Energy Consumption Per Unit Products of Silicon Metal.
Norm of Energy Consumption per unit Throughput of
Industrial Silicon and Magnesium
1 Scope
This Document stipulates the grade, technical requirements, energy consumption statistical
range and calculation method for norm of energy consumption per unit throughput of industrial
silicon and magnesium.
This Document is applicable to the calculation and assessment of energy consumption per unit
throughput of industrial silicon and magnesium, as well as the energy consumption control of
new construction, renovation and expansion projects. Among them, the energy consumption
per unit throughput of magnesium is applicable to the silicothermal magnesium smelting
process and is not applicable to other processes such as electrolysis.
2 Normative References
The provisions in following documents become the essential provisions of this Document
through reference in this Document. For the dated documents, only the versions with the dates
indicated are applicable to this Document; for the undated documents, only the latest version
(including all the amendments) is applicable to this Document.
GB/T 2589 General principles for calculation of the comprehensive energy consumption
GB/T 2881 Silicon metal
GB/T 3499 Magnesium ingots
GB/T 12723 General principles for establishing allowance of energy consumption per unit
throughput
3 Terms and Definitions
For the purposes of this Document, the terms and definitions given in GB/T 2589 and GB/T
12723 apply.
a) Main production system: including the amount of energy consumed by the smelting
process, refining process, casting, crushing and screening. It mainly includes the energy
consumptions by the following objects, such as the smelting power consumption of the
production system (including furnace charge heating, smelting to maintain furnace
conditions, oven electricity, furnace washing electricity, power electricity, lighting
electricity), carbonaceous reducing agents for ore reduction (including petroleum coke,
coal, charcoal, etc., biomass energy such as wood chips is excluded) and energy-
consuming working fluids (water, oxygen, compressed air, etc.). Electrode losses are not
included in the energy consumption of the production system.
b) Auxiliary production system: including raw material preparation, transportation, pouring,
finishing, environmental protection facilities, circulating water system and the amount
of energy consumed in the transportation of materials and industrial silicon. The
calculation needs to deduct the electricity consumed by desulfurization and
denitrification during deep flue gas purification.
c) Ancillary production system: equipment and facilities required to provide services during
the production process, including the amount of energy consumed by raw material testing,
laboratory testing, vehicle transportation, maintenance, factory canteens, administrative
management, etc.
6.1.2 Magnesium
The comprehensive energy consumption per unit throughput of magnesium includes the energy
consumption of the smelting production system, the energy consumption of the auxiliary
production system and the energy consumption of the ancillary production system; excluding
the amount of secondary energy [export coal, slime and gangue, tar residue , semi-coke (blue
carbon and clean carbon), tar, etc.] recycled and supplied externally during the production
process; excluding domestic energy and energy consumed by approved infrastructure project.
Details are as follows.
a) Main production system: including the amount of energy consumed by the gas production
process, calcination process, preparation process, reduction process and refining process.
NOTE: The combined silicothermal method has a gas production process, while the traditional
silicothermal method does not have a gas production process and uses purchased energy for
magnesium smelting production.
b) Auxiliary production system: the energy consumed by equipment and facilities required
for the normal completion of auxiliary production (including wind, oil, water, gas,
oxygen and other systems required for production, fans, dust collection, smoke treatment,
instrumentation and environmental protection facilities, etc.).
c) Ancillary production system: equipment and facilities required to provide services during
the production process, including the amount of energy consumed by raw material testing,
laboratory testing, vehicle transportation, maintenance, factory canteens, administrative
management, etc.
6.2 Calculation method
The comprehensive energy consumption per unit throughput of industrial silicon or magnesium
is expressed by eX (X is Si or Mg), and the unit is kilograms of standard coal per ton (kgce/t),
calculated according to Formula (1):
Where:
ki - the conversion coefficient of type ith energy (including energy-consuming working fluids)
consumed by the main production systems during the statistical reporting period;
ei - The physical amount of type ith energy consumed by the main production systems during
the statistical reporting period (including the amount of energy consumed by energy-consuming
working fluids);
EFZ - The energy consumption of the auxiliary production system during the statistical reporting
period, in kgce;
EFS ?€? The energy consumption of ancillary production systems during the statistical reporting
period, in kgce;
EHW - The amount of secondary energy recovered and supplied externally during the statistical
reporting period, in kgce;
MX ?€? The output of industrial silicon or primary magnesium ingots qualified for storage during
the statistical reporting period, in tons (t). Industrial silicon shall comply with the provisions of
GB/T 2881, and primary magnesium ingots shall comply with the provisions of GB/T 3499.
6.3 Conversion coefficient
The low calorific value of energy and the energy consumption of energy-consuming working
fluids shall be converted into standard coal based on actual measured values or data provided
by the supply organization. If the actual measured value cannot be obtained, the standard coal
conversion coefficient can refer to the data published by the National Bureau of Statistics or
the data given in Appendixes A and B. For self-produced secondary energy, the standard coal
conversion coefficient shall be calculated and determined based on actual input and output.

Vedeți detaliile complete