1
/
от
12
PayPal, credit cards. Download editable-PDF and invoice in 1 second!
TB 10029-2009 English PDF
TB 10029-2009 English PDF
Обичайна цена
$605.00 USD
Обичайна цена
Цена при разпродажба
$605.00 USD
Единична цена
/
за
Не може да се зареди възможността за взимане
Delivery: 2 working-hours manually (Sales@ChineseStandard.net)
Need delivered in 3-second? USA-Site: TB 10029-2009
Get Quotation: Click TB 10029-2009 (Self-service in 1-minute)
Historical versions (Master-website): TB 10029-2009
Preview True-PDF (Reload/Scroll-down if blank)
TB 10029-2009: Code for design of railway passenger car rolling stock facilities
TB 10029-2009
TB
INDUSTRY STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
UDC
P TB 10029-2009
J 165-2009
Code for design of railway passenger car rolling stock
facilities
ISSUED ON: JULY 01, 2009
IMPLEMENTED ON: JULY 06, 2009
Issued by: Ministry of Railway of PRC
INDUSTRY STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
Code for design of railway passenger car rolling stock
facilities
J 165-2009
Main drafting organization: China Railway Second Engineering Group Co., Ltd.
Participating drafting organization: The Third Railway Survey and Design
Institute Group Co., Ltd.
Effective date: July 6, 2009
2009 • Beijing
Table of Contents
Foreword ... 6
1 General ... 8
2 Terms ... 9
3 Passenger car rolling stock depot ... 11
3.1 General rules ... 11
3.2 Selection of passenger car depot site ... 12
3.3 Scale of the passenger car rolling stock depot ... 12
3.4 General layout of the passenger car depot ... 13
3.5 Repair garage ... 16
3.6 Paint warehouse... 18
3.7 Bogie room ... 18
3.8 Axle room ... 20
3.9 Wheel shed ... 21
3.10 Rolling bearing room ... 21
3.11 Accessory repairing center ... 22
3.12 Servicing workshop for passenger car's air-conditioning units ... 23
3.13 Hook buffer room ... 23
3.14 Electrical and electronic servicing workshop ... 24
3.15 Brake room ... 25
3.16 Other servicing workshops ... 25
3.17 Laboratory ... 26
3.18 Metering room ... 26
3.19 Equipment servicing room ... 27
3.20 Boiler room ... 28
3.21 Compressed air station ... 28
3.23 Material warehouse ... 29
3.24 Transportation equipment... 30
4 Passenger car technical servicing depot ... 31
4.1 General rules ... 31
4.2 Location and general layout of passenger car technical servicing depot ... 32
4.3 Line layout and main facilities on the line group ... 33
4.4 Repairing workshop... 38
4.5 Power facilities ... 43
4.6 Material warehouse and garage ... 43
4.7 Oil depot ... 44
5 Passenger car inspection department ... 45
6 Information system ... 46
6.1 General ... 46
6.2 System composition and function ... 46
6.3 Network design... 47
6.4 System software and hardware configuration ... 48
6.5 Others ... 49
Explanation of wording in this code ... 50
Code for design of railway passenger car rolling stock
facilities
1 General
1.0.1 In order to improve the servicing quality of railway passenger cars, ensure
the safety of passenger cars, unify the technical standards for the design of
passenger car rolling stock facilities, make the design of passenger car rolling
stock facilities to be technologically advanced, economical and reasonable,
safe and applicable, this code is hereby formulated.
1.0.2 This code is applicable to the engineering design of new or rebuilt railway
passenger car facilities with standard gauges in the national railway network.
1.0.3 The design of railway passenger car facilities shall include facilities such
as passenger car rolling stock depot (referred to as passenger car depot),
passenger car technical servicing depot, railway passenger car inspection
department (referred to as passenger car inspection department).
1.0.4 The design year of railway passenger car rolling stock facilities shall be
divided into short-term and long-term. The short-term is the 10th year after
delivery and operation; the long-term is the 20th year after delivery and
operation.
The design of railway passenger car rolling stock facilities shall be a
combination of short-term and long-term, focusing on the short-term, reserve
development conditions based on the long-term scale.
1.0.5 The design of passenger car rolling stock facilities shall be based on
factors such as the car type, number of cars attached, the workload of overhaul
and operation and servicing, transportation organization, related passenger car
rolling stock facilities, as well as the passenger car repair system, car
technology development, road network planning.
When determining the design plan of the passenger car rolling stock facilities,
a technical and economic comparison shall be made to select the best plan.
1.0.6 During the renovation and expansion of railway passenger car rolling
stock facilities, existing equipment may be used to minimize demolition and
abandonment work, reduce the impact and interference of construction on
production.
rolling stock facilities (including passenger car rolling stock depots, passenger
car technical servicing depots, passenger car inspection department, etc.).
2.0.2 Passenger car rolling stock depot
The production premises that undertake the servicing of railway passenger car
depots and the management tasks of the operation and servicing of passenger
car rolling stock facilities within its jurisdiction.
2.0.3 Passenger car technical servicing depot
The passenger car operation and servicing place which is responsible for the
technical inspection of passenger cars of the departure and the final arrival, as
well as the regular servicing of the passenger cars and the electric equipment.
2.0.4 Passenger car inspection department
The operation and servicing space for passenger cars that undertakes technical
inspections of passenger cars, brake tests, repairs without taking off the trains.
2.0.5 Passenger car stabling sidings
In the passenger car technical service depot, the line which is used for parking
under the passenger car.
2.0.6 Coefficient of non-serviceable rolling stock
The ratio of the sum of the number of spare cars and the number of overhauled
cars to the number of cars in use.
2.0.7 Utility factor of car repairing positions
The ratio of the number of cars in the daily servicing of car equipment to the
number of servicing depots in the repair garage (shed).
2.0.8 Coefficient of passenger car servicing tracks
The ratio of the number of passenger car servicing tracks configured to the
number of servicing passenger train sets that needs to enter the servicing
position.
2.0.9 Length of each car repairing position
The length of each car repair position occupying the repairing track.
2.0.10 Calculation length of car
The length of the car as specified for calculating the length of the track occupied
by the parked car.
loading and unloading lines and roads; there shall be sufficient space near the
warehouse. The storage rooms for flammable, explosive, toxic, hazardous and
other dangerous goods shall be set up separately, which shall comply with
relevant requirements for safety and environmental protection.
3.4.3 The workshop that generates noise and shock vibration shall be far away
from the laboratory, metering room, bearing room, brake room, etc. Workshops
that produce high temperature, dust, and toxic and harmful gases shall be
arranged on the upwind side of the annual minimum frequency wind direction,
whilst the metering room shall be arranged on the downwind side of the annual
minimum frequency wind direction.
3.4.4 Power facilities such as compressed air stations and substations shall be
close to the load center.
The compressed air station shall be arranged on the leeward side of the annual
minimum frequency wind direction of the workshop that emits dust and harmful
gases; meanwhile it shall avoid the impact of noise and vibration on the
surrounding environment.
3.4.5 The storage site for scrap iron and steel in the depot shall be located in a
place that is convenient for loading and relatively hidden. The location of
sewage treatment facilities in the depot shall be determined according to factors
such as the location of the discharge outlet, wind direction, servicing
management, transportation.
When coal-fired boilers are used, coal yards, slag yards, fences shall be set
near the boiler room. When oil-fired boilers are used, corresponding oil storage
tanks shall be installed and safety protection measures shall be taken.
3.4.6 Circular transportation roads shall be designed in the depot; there shall
be no less than two entrance and exit connected with roads (or transportation
roads) outside the depot.
The road should adopt a concrete pavement; the width of the pavement is 6.0
m for main arterial road (two-way lane), 3.5 m for non-main arterial road (single-
lane), not less than 2.0 m for sidewalk.
3.4.7 The width of the passage between the buildings in the depot shall comply
with the requirements for fire protection, safety and health; meanwhile it shall
meet the requirements for building roads, laying various underground and
overhead pipelines, greening. The width of the main channel shall not be less
than 18.0 m; the width of the general channel shall not be less than 12.0 m.
3.4.8 The determination of the fire separation distance between adjacent
buildings and the fire hazard rating of the buildings in the depot shall comply
with the current national "Code of design on building fire protection and
3.4.13 The passenger car depot shall have a parking lane; its effective length
shall be determined by 1.5 ~ 2.5 times the number of car repair positions
multiplied by the calculated car length of 26.5 m. There should be no less than
two parking lanes; a pedestrian hardened passage with a width of 1.0 m shall
be set between the tracks.
The parking lane should be flat slope; the gradient of the longitudinal cross-
section shall not be greater than 1.0‰ when there is difficulty. The space
between the parking lanes and the outside of the lane group (the range of 3.0
m from the center line of the lane) should be filled with fine ballast to the bottom
of the rail.
3.4.14 There shall be wheelset loading and unloading line in the passenger car
depot. The length of the wheelset loading and unloading line into the wheelset
shed shall be able to meet the requirements of parking a gondola and crane
hook operation range and shunting operation safety.
The material transportation line shall be located near the material warehouse
or boiler room. When conditions permit, a wheelset loading and unloading line
and a material transportation line can be built together.
3.4.15 The passenger car depot should be equipped with shunting machines,
with shunting machine parking lines and shunting hangars.
3.4.16 The passenger car depot shall be set up as a lead line as required; its
effective length shall be determined according to the number of car repairing
positions, the calculated length of car, the length of the shunting machine, the
safe distance for shunting operations. When conditions permit, the entry and
exit line can also be used as a lead line.
3.4.17 The wheel storage shed should be adjacent to the bogie room and
between the axle room; the wheel transport line shall be provided in the shed
to communicate with the axle room.
3.4.18 The passenger car depot should be equipped with a passenger car
cleaning shed (warehouse). The shed (warehouse) shall be equipped with
passenger car chassis washing equipment.
3.5 Repair garage
3.5.1 The type of repair garage shall be determined based on the workload,
operation methods, repair techniques of the car, combined with factors such as
topography and meteorological conditions.
3.5.2 The method of repairing the car can adopt positioning operation or stage
operation. The number of repairing positions for each line of the repair garage
4 When there is a bogie or wheel-set lateral conveying track at the end of the
repair garage, the distance from the center of the line to the inner side of
the end wall shall meet the requirements of the hanging bogie of bridge
crane or the wheelset operation;
5 Compressed air, water supply, power wiring shall be laid in the repair
garage; the AC 380 V and DC 600 V surface external test power supply
and electric welding secondary lines shall be installed as required. It is
strictly forbidden to use the repair line's rails as electric welding secondary
circuit circuits.
6 The repair garage may be provided with servicing trenches as needed.
7 Drainage and ventilation facilities shall be provided in the repair garage.
3.6 Paint warehouse
3.6.1 The passenger car depot shall set up a separate paint warehouse. When
restricted by conditions, the paint warehouse can be set up at the end of the
repair garage (or combined garage), meanwhile the paint stand is separated
from the repair position (or adjacent workshop) by a firewall and fire door.
3.6.2 The number of booths in the paint warehouse shall match the capacity of
the repair garage; it should be designed according to 1/5 ~ 1/6 of the number
of positions in the repair garage.
3.6.3 The length of the paint warehouse can be designed as 36 m for each
position; the warehouse length will increase by 30 m for each additional position;
the headroom of the warehouse shall be determined according to the
requirements of the painting process and equipment.
3.6.4 The paint warehouse shall be equipped with painting, drying, paint mist
purification equipment and ventilation facilities as required; the electrical and
lighting equipment in the warehouse shall be explosion-proof.
3.7 Bogie room
3.7.1 The bogie room should be designed according to the positioning operation
and servicing process; meanwhile it shall be provided with the bogie
disassembly, rust removal, servicing, testing, assembly positions.
3.7.2 The number of bogie inspection positions shall be determined according
to factors such as inspection workload, inspection time, imbalance.
The number of positioning inspection stations can be calculated by the following
3.8 Axle room
3.8.1 The axle room of the passenger car rolling stock depot shall be considered
by the railway bureau as a whole. It should not set up the axle room in each
passenger car rolling stock depot.
3.8.2 The axle servicing process shall be determined according to the process
layout between the bogie room as well as the combination form of the servicing
process of wheelsets, axle boxes, bearings, etc. When the axle room and the
Need delivered in 3-second? USA-Site: TB 10029-2009
Get Quotation: Click TB 10029-2009 (Self-service in 1-minute)
Historical versions (Master-website): TB 10029-2009
Preview True-PDF (Reload/Scroll-down if blank)
TB 10029-2009: Code for design of railway passenger car rolling stock facilities
TB 10029-2009
TB
INDUSTRY STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
UDC
P TB 10029-2009
J 165-2009
Code for design of railway passenger car rolling stock
facilities
ISSUED ON: JULY 01, 2009
IMPLEMENTED ON: JULY 06, 2009
Issued by: Ministry of Railway of PRC
INDUSTRY STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
Code for design of railway passenger car rolling stock
facilities
J 165-2009
Main drafting organization: China Railway Second Engineering Group Co., Ltd.
Participating drafting organization: The Third Railway Survey and Design
Institute Group Co., Ltd.
Effective date: July 6, 2009
2009 • Beijing
Table of Contents
Foreword ... 6
1 General ... 8
2 Terms ... 9
3 Passenger car rolling stock depot ... 11
3.1 General rules ... 11
3.2 Selection of passenger car depot site ... 12
3.3 Scale of the passenger car rolling stock depot ... 12
3.4 General layout of the passenger car depot ... 13
3.5 Repair garage ... 16
3.6 Paint warehouse... 18
3.7 Bogie room ... 18
3.8 Axle room ... 20
3.9 Wheel shed ... 21
3.10 Rolling bearing room ... 21
3.11 Accessory repairing center ... 22
3.12 Servicing workshop for passenger car's air-conditioning units ... 23
3.13 Hook buffer room ... 23
3.14 Electrical and electronic servicing workshop ... 24
3.15 Brake room ... 25
3.16 Other servicing workshops ... 25
3.17 Laboratory ... 26
3.18 Metering room ... 26
3.19 Equipment servicing room ... 27
3.20 Boiler room ... 28
3.21 Compressed air station ... 28
3.23 Material warehouse ... 29
3.24 Transportation equipment... 30
4 Passenger car technical servicing depot ... 31
4.1 General rules ... 31
4.2 Location and general layout of passenger car technical servicing depot ... 32
4.3 Line layout and main facilities on the line group ... 33
4.4 Repairing workshop... 38
4.5 Power facilities ... 43
4.6 Material warehouse and garage ... 43
4.7 Oil depot ... 44
5 Passenger car inspection department ... 45
6 Information system ... 46
6.1 General ... 46
6.2 System composition and function ... 46
6.3 Network design... 47
6.4 System software and hardware configuration ... 48
6.5 Others ... 49
Explanation of wording in this code ... 50
Code for design of railway passenger car rolling stock
facilities
1 General
1.0.1 In order to improve the servicing quality of railway passenger cars, ensure
the safety of passenger cars, unify the technical standards for the design of
passenger car rolling stock facilities, make the design of passenger car rolling
stock facilities to be technologically advanced, economical and reasonable,
safe and applicable, this code is hereby formulated.
1.0.2 This code is applicable to the engineering design of new or rebuilt railway
passenger car facilities with standard gauges in the national railway network.
1.0.3 The design of railway passenger car facilities shall include facilities such
as passenger car rolling stock depot (referred to as passenger car depot),
passenger car technical servicing depot, railway passenger car inspection
department (referred to as passenger car inspection department).
1.0.4 The design year of railway passenger car rolling stock facilities shall be
divided into short-term and long-term. The short-term is the 10th year after
delivery and operation; the long-term is the 20th year after delivery and
operation.
The design of railway passenger car rolling stock facilities shall be a
combination of short-term and long-term, focusing on the short-term, reserve
development conditions based on the long-term scale.
1.0.5 The design of passenger car rolling stock facilities shall be based on
factors such as the car type, number of cars attached, the workload of overhaul
and operation and servicing, transportation organization, related passenger car
rolling stock facilities, as well as the passenger car repair system, car
technology development, road network planning.
When determining the design plan of the passenger car rolling stock facilities,
a technical and economic comparison shall be made to select the best plan.
1.0.6 During the renovation and expansion of railway passenger car rolling
stock facilities, existing equipment may be used to minimize demolition and
abandonment work, reduce the impact and interference of construction on
production.
rolling stock facilities (including passenger car rolling stock depots, passenger
car technical servicing depots, passenger car inspection department, etc.).
2.0.2 Passenger car rolling stock depot
The production premises that undertake the servicing of railway passenger car
depots and the management tasks of the operation and servicing of passenger
car rolling stock facilities within its jurisdiction.
2.0.3 Passenger car technical servicing depot
The passenger car operation and servicing place which is responsible for the
technical inspection of passenger cars of the departure and the final arrival, as
well as the regular servicing of the passenger cars and the electric equipment.
2.0.4 Passenger car inspection department
The operation and servicing space for passenger cars that undertakes technical
inspections of passenger cars, brake tests, repairs without taking off the trains.
2.0.5 Passenger car stabling sidings
In the passenger car technical service depot, the line which is used for parking
under the passenger car.
2.0.6 Coefficient of non-serviceable rolling stock
The ratio of the sum of the number of spare cars and the number of overhauled
cars to the number of cars in use.
2.0.7 Utility factor of car repairing positions
The ratio of the number of cars in the daily servicing of car equipment to the
number of servicing depots in the repair garage (shed).
2.0.8 Coefficient of passenger car servicing tracks
The ratio of the number of passenger car servicing tracks configured to the
number of servicing passenger train sets that needs to enter the servicing
position.
2.0.9 Length of each car repairing position
The length of each car repair position occupying the repairing track.
2.0.10 Calculation length of car
The length of the car as specified for calculating the length of the track occupied
by the parked car.
loading and unloading lines and roads; there shall be sufficient space near the
warehouse. The storage rooms for flammable, explosive, toxic, hazardous and
other dangerous goods shall be set up separately, which shall comply with
relevant requirements for safety and environmental protection.
3.4.3 The workshop that generates noise and shock vibration shall be far away
from the laboratory, metering room, bearing room, brake room, etc. Workshops
that produce high temperature, dust, and toxic and harmful gases shall be
arranged on the upwind side of the annual minimum frequency wind direction,
whilst the metering room shall be arranged on the downwind side of the annual
minimum frequency wind direction.
3.4.4 Power facilities such as compressed air stations and substations shall be
close to the load center.
The compressed air station shall be arranged on the leeward side of the annual
minimum frequency wind direction of the workshop that emits dust and harmful
gases; meanwhile it shall avoid the impact of noise and vibration on the
surrounding environment.
3.4.5 The storage site for scrap iron and steel in the depot shall be located in a
place that is convenient for loading and relatively hidden. The location of
sewage treatment facilities in the depot shall be determined according to factors
such as the location of the discharge outlet, wind direction, servicing
management, transportation.
When coal-fired boilers are used, coal yards, slag yards, fences shall be set
near the boiler room. When oil-fired boilers are used, corresponding oil storage
tanks shall be installed and safety protection measures shall be taken.
3.4.6 Circular transportation roads shall be designed in the depot; there shall
be no less than two entrance and exit connected with roads (or transportation
roads) outside the depot.
The road should adopt a concrete pavement; the width of the pavement is 6.0
m for main arterial road (two-way lane), 3.5 m for non-main arterial road (single-
lane), not less than 2.0 m for sidewalk.
3.4.7 The width of the passage between the buildings in the depot shall comply
with the requirements for fire protection, safety and health; meanwhile it shall
meet the requirements for building roads, laying various underground and
overhead pipelines, greening. The width of the main channel shall not be less
than 18.0 m; the width of the general channel shall not be less than 12.0 m.
3.4.8 The determination of the fire separation distance between adjacent
buildings and the fire hazard rating of the buildings in the depot shall comply
with the current national "Code of design on building fire protection and
3.4.13 The passenger car depot shall have a parking lane; its effective length
shall be determined by 1.5 ~ 2.5 times the number of car repair positions
multiplied by the calculated car length of 26.5 m. There should be no less than
two parking lanes; a pedestrian hardened passage with a width of 1.0 m shall
be set between the tracks.
The parking lane should be flat slope; the gradient of the longitudinal cross-
section shall not be greater than 1.0‰ when there is difficulty. The space
between the parking lanes and the outside of the lane group (the range of 3.0
m from the center line of the lane) should be filled with fine ballast to the bottom
of the rail.
3.4.14 There shall be wheelset loading and unloading line in the passenger car
depot. The length of the wheelset loading and unloading line into the wheelset
shed shall be able to meet the requirements of parking a gondola and crane
hook operation range and shunting operation safety.
The material transportation line shall be located near the material warehouse
or boiler room. When conditions permit, a wheelset loading and unloading line
and a material transportation line can be built together.
3.4.15 The passenger car depot should be equipped with shunting machines,
with shunting machine parking lines and shunting hangars.
3.4.16 The passenger car depot shall be set up as a lead line as required; its
effective length shall be determined according to the number of car repairing
positions, the calculated length of car, the length of the shunting machine, the
safe distance for shunting operations. When conditions permit, the entry and
exit line can also be used as a lead line.
3.4.17 The wheel storage shed should be adjacent to the bogie room and
between the axle room; the wheel transport line shall be provided in the shed
to communicate with the axle room.
3.4.18 The passenger car depot should be equipped with a passenger car
cleaning shed (warehouse). The shed (warehouse) shall be equipped with
passenger car chassis washing equipment.
3.5 Repair garage
3.5.1 The type of repair garage shall be determined based on the workload,
operation methods, repair techniques of the car, combined with factors such as
topography and meteorological conditions.
3.5.2 The method of repairing the car can adopt positioning operation or stage
operation. The number of repairing positions for each line of the repair garage
4 When there is a bogie or wheel-set lateral conveying track at the end of the
repair garage, the distance from the center of the line to the inner side of
the end wall shall meet the requirements of the hanging bogie of bridge
crane or the wheelset operation;
5 Compressed air, water supply, power wiring shall be laid in the repair
garage; the AC 380 V and DC 600 V surface external test power supply
and electric welding secondary lines shall be installed as required. It is
strictly forbidden to use the repair line's rails as electric welding secondary
circuit circuits.
6 The repair garage may be provided with servicing trenches as needed.
7 Drainage and ventilation facilities shall be provided in the repair garage.
3.6 Paint warehouse
3.6.1 The passenger car depot shall set up a separate paint warehouse. When
restricted by conditions, the paint warehouse can be set up at the end of the
repair garage (or combined garage), meanwhile the paint stand is separated
from the repair position (or adjacent workshop) by a firewall and fire door.
3.6.2 The number of booths in the paint warehouse shall match the capacity of
the repair garage; it should be designed according to 1/5 ~ 1/6 of the number
of positions in the repair garage.
3.6.3 The length of the paint warehouse can be designed as 36 m for each
position; the warehouse length will increase by 30 m for each additional position;
the headroom of the warehouse shall be determined according to the
requirements of the painting process and equipment.
3.6.4 The paint warehouse shall be equipped with painting, drying, paint mist
purification equipment and ventilation facilities as required; the electrical and
lighting equipment in the warehouse shall be explosion-proof.
3.7 Bogie room
3.7.1 The bogie room should be designed according to the positioning operation
and servicing process; meanwhile it shall be provided with the bogie
disassembly, rust removal, servicing, testing, assembly positions.
3.7.2 The number of bogie inspection positions shall be determined according
to factors such as inspection workload, inspection time, imbalance.
The number of positioning inspection stations can be calculated by the following
3.8 Axle room
3.8.1 The axle room of the passenger car rolling stock depot shall be considered
by the railway bureau as a whole. It should not set up the axle room in each
passenger car rolling stock depot.
3.8.2 The axle servicing process shall be determined according to the process
layout between the bogie room as well as the combination form of the servicing
process of wheelsets, axle boxes, bearings, etc. When the axle room and the
Share











