Прескочи към информацията за продукта
1 от 12

PayPal, credit cards. Download editable-PDF and invoice in 1 second!

NB/T 31073-2015 English PDF (NB/T31073-2015)

NB/T 31073-2015 English PDF (NB/T31073-2015)

Обичайна цена $730.00 USD
Обичайна цена Цена при разпродажба $730.00 USD
Разпродажба Изчерпано
Delivery: 2 working-hours manually (Sales@ChineseStandard.net)
Need delivered in 3-second? USA-Site: NB/T 31073-2015
Get Quotation: Click NB/T 31073-2015 (Self-service in 1-minute)
Historical versions (Master-website): NB/T 31073-2015
Preview True-PDF (Reload/Scroll-down if blank)

NB/T 31073-2015: Occupational safety and health acceptance specification for wind power projects
NB/T 31073-2015
NB
ENERGY INDUSTRY STANDARD OF
THE PEOPLE’S REPUBLIC OF CHINA
ICS 27.180
P 61
Filing No.: J2040-2015
P NB/T 31073-2015
Occupational safety and health acceptance
specification for wind power projects
ISSUED ON: APRIL 02, 2015
IMPLEMENTED ON: SEPTEMBER 01, 2015
Issued by: National Energy Administration
Table of Contents
Foreword ... 6 
1 General provisions ... 7 
2 Terms ... 8 
3 Acceptance conditions ... 9 
4 Acceptance procedure ... 10 
5 Main contents of acceptance ... 15 
6 Compilation requirement and content of acceptance file ... 17 
Appendix A Acceptance procedure ... 19 
Appendix B Application form of acceptance (Format) ... 20 
Appendix C Main contents of acceptance outline process ... 22 
Appendix D Acceptance certification ... 24 
Appendix E Acceptance test report format ... 26 
Appendix F Design of self-reporting requirements and main contents ... 29 
Appendix G Main contents of construction and operation of self-inspection
report ... 31 
Appendix H Main contents of construction installation of self-inspection report
... 32 
Appendix J Main contents of construction and operation of self-inspection report
... 33 
Explanation of wording in this specification ... 36 
List of normative references ... 37 
Additions: explanation of provisions ... 38 
Occupational safety and health acceptance
specification for wind power projects
1 General provisions
1.0.1 In order to standardize and guide the special completion acceptance of
labor safety and industrial hygiene of wind farm projects, this Specification is
hereby formulated, in accordance with national laws, regulations, rules,
standards, other requirements.
1.0.2 This Specification is applicable to the special completion acceptance of
labor safety and industrial hygiene of newly built, rebuilt and expanded grid-
connected onshore wind farm projects and offshore wind farm projects.
1.0.3 The scope of the special completion inspection and acceptance of the
labor safety and industrial hygiene of the wind farm project, includes the safety
protection facilities of the wind turbines involved in the wind farm project and
the supporting voltage boosting equipment, current collection lines, booster
stations, other auxiliary facilities of the wind farm.
1.0.4 The special completion acceptance of the labor safety and industrial
hygiene, of the wind farm project, is divided into three stages: application for
acceptance and data pre-review, on-site inspection and joint review, review and
acceptance.
1.0.5 For the special completion acceptance of the labor safety and industrial
hygiene, of the wind farm project, the acceptance committee, which is
composed of the presiding organization for acceptance and the safety
supervision department where the project is located, shall carry out the
acceptance work.
1.0.6 The project owner shall report the use of engineering safety facilities and
major engineering incidents (accidents), to the presiding organization of
acceptance, within 2 years, after the special completion acceptance of the labor
safety and industrial hygiene.
1.0.7 The inspection acceptance of labor safety and industrial hygiene, of wind
farm projects, shall not only comply with this Specification, but also comply with
the current relevant national standards.
4 Acceptance procedure
4.1 Organization of acceptance
4.1.1 The acceptance presiding organization is responsible for organizing the
completion acceptance of the labor safety and industrial hygiene. The
acceptance presiding organization, together with the government safety
supervision department and other organizations, form an acceptance
committee AND an acceptance expert group. The acceptance committee is
responsible for verifying the acceptance appraisal; the acceptance expert group
conducts on-site inspections.
4.1.2 The acceptance committee is composed of the chairman, vice-chairmen,
members. The chairman of the acceptance committee is generally assumed by
the representative of the acceptance presiding organization; the vice-chairman
is the representative of the safety supervision department of the people's
government where the project is located and the representative of the project
owner’s superior department. The members include the representatives from
the participated project construction organization AND the operation
organization, as well as the acceptance expert team leader, etc.
4.2 Application acceptance
4.2.1 When the project has the completion acceptance conditions for labor
safety and industrial hygiene, the project owner shall submit the completion
acceptance application for labor safety and industrial hygiene, to the
acceptance presiding organization, according to the acceptance procedures
(see Appendix A); meanwhile submit the following documents and materials,
with one copy of the electronic version (CD-ROM) attached:
1 Acceptance application report and application form (3 copies). The format
of the application form is as shown in Appendix B of this Specification.
2 Design self-inspection report, supervision self-inspection report,
construction and installation self-inspection report, construction and
operation self-inspection report (3 copies each), for the completion
acceptance of labor safety and industrial hygiene.
3 Safety acceptance evaluation report (draft for review) (10 copies), which is
prepared by a correspondingly qualified safety evaluation agency.
4.2.2 The project owner shall prepare the following documents and materials
for reference (original if necessary), at the same time:
1 Safety pre-evaluation report and its review opinions.
determine the member units of the acceptance committee; organize
experts in related disciplines, to establish an acceptance expert group.
2 The acceptance presiding organization shall prepare an acceptance work
outline, before the on-site inspection; copy the acceptance work outline to
each member unit of the acceptance committee. The main content of the
acceptance work outline is as shown in Appendix C of this Specification.
4.4.2 On-site inspection and review:
1 The acceptance expert group conducts an on-site inspection; conducts a
technical review of the safety acceptance evaluation report (draft for
review); proposes on-site inspection opinions AND preliminary opinions
on the safety acceptance evaluation report review.
2 After the labor safety and industrial hygiene facilities of the wind farm
project have passed the expert on-site inspection, the project owner shall
carry out rectification, in accordance with the on-site inspection opinions
of the inspection and acceptance of safety and industrial hygiene; submit
a formal written rectification report, to the acceptance presiding
organization. When necessary, the acceptance presiding organization
shall review the implementation of on-site rectification by the project owner.
If the labor safety and industrial hygiene facilities of the wind farm project
fail the on-site inspection and acceptance by experts, the project owner
shall make rectifications, in accordance with relevant national regulations
AND the on-site inspection opinions of the completion acceptance of labor
safety and industrial hygiene; perform safety acceptance evaluation again,
before following the procedures to apply for the completion acceptance of
labor safety and industrial hygiene.
3 If the safety acceptance evaluation report (draft for review) has passed the
technical review, the evaluation agency will revise and improve the report,
based on the preliminary comments of the safety acceptance evaluation
report review; then submit the safety acceptance evaluation report (filed
draft), to the acceptance presiding organization, for review.
If the safety acceptance evaluation report (draft for review) fails the
technical review, the evaluation agency shall re-evaluate AND report to
the acceptance presiding organization, for review.
4.5 Review and acceptance
4.5.1 After confirming that the project owner has completed the rectification as
required, AND the evaluation agency revised and completed the safety
acceptance evaluation report (filed draft), according to the preliminary opinions
of the safety acceptance evaluation report, it shall organize the member units
of the acceptance committee, to convene the completion acceptance meeting
for the labor safety and industry hygiene.
4.5.2 The project owner shall provide the following materials for reference, at
the completion acceptance meeting:
1 On-site inspection and rectification report of the completion acceptance of
labor safety and industrial hygiene.
2 Safety acceptance evaluation report (filed draft).
3 The design self-inspection report, supervision self-inspection report,
construction and installation self-inspection report, building and operation
self-inspection report, for the completion acceptance of labor safety and
industrial hygiene, after modification, based on the opinions of the on-site
inspection expert group.
4.5.3 The acceptance committee discussed and formed the completion
acceptance certification, for labor safety and industrial hygiene of the wind farm
project. The format is as shown in Appendix D of this Specification. The
acceptance certification shall have clear conclusions. The acceptance
conclusion must be approved by more than two-thirds of the acceptance
committee members. The members of the acceptance committee shall sign the
appraisal. If there is any objection to the acceptance conclusion, the objection
opinions shall be clearly recorded and signed on the acceptance certification.
4.5.4 Under any of the following circumstances, the completion acceptance
inspection for labor safety and industrial hygiene is unqualified:
1 Failure to select a construction organization, which has corresponding
qualifications, for construction.
2 Failure to construct in accordance with the engineering safety facility
design documents OR the construction quality does not meet the
requirements of the engineering safety facility's design documents.
3 The construction of engineering safety facilities does not meet the relevant
technical standards on national construction.
4 Failure to select a safety evaluation agency, which has corresponding
qualifications, for safety acceptance evaluation, OR failure to pass the
safety acceptance evaluation.
5 Safety facilities and production safety conditions do not comply with
relevant safety production laws, regulations, rules and national standards
or industry standards or technical specifications.
5 Main contents of acceptance
5.0.1 The on-site inspection of labor safety and industrial hygiene facilities
mainly includes the following contents:
1 Safe production conditions, installation and use of safety facilities.
2 Conventional protective facilities and measures for wind farm projects,
including geological disaster prevention measures related to labor safety
and industrial hygiene, flood (tide) water and waterlogging prevention
measures, weather disaster prevention measures, approach and on-site
traffic safety facilities, etc.
3 Engineering fire protection and explosion-proof measures.
4 Measures for lightning protection and electrical damage.
5 Measures to prevent mechanical injuries, lifting injuries, falling from height.
6 Safety control measures for harmful factors in the working environment,
including: noise prevention, vibration prevention, dust prevention,
pollution prevention, corrosion prevention, electromagnetic radiation
prevention, daylighting and lighting, indoor air quality, temperature and
humidity, toxic and hazardous substances control measures, configuration
of labor protection equipment for workers, etc.
7 Safety monitoring and testing facilities.
8 Inspection and testing of special equipment and mandatory inspection
equipment and facilities.
9 Safety colors and safety signs.
10 The setting of auxiliary rooms.
11 The establishment of safety production management organization OR the
deployment of safety production management personnel.
12 The development and implementation of the safety management system
and emergency response plan.
13 Qualifications of employees receiving safety education and training AND
special operations personnel.
14 Anti-terrorism prevention facilities, emergency prevention and disposal
measures.
6 Compilation requirement and content of
acceptance file
6.0.1 The design self-inspection report, supervision self-inspection report,
construction and installation self-inspection report, construction operation self-
inspection report of the completion acceptance, for the labor safety and
industrial hygiene, shall be prepared by the design, supervision, construction,
building operation organizations, respectively. Each organization shall be
responsible for the accuracy of the information provided. For the preparation
format requirements of the acceptance self-inspection report, see Appendix E
of this Specification.
6.0.2 The preparation requirements and main contents of the acceptance self-
inspection report are as follows:
1 See Appendix F, for the preparation requirements and main content of the
design self-inspection report.
2 See Appendix G, for the main content of the supervision self-inspection
report.
3 See Appendix H, for the main content of the construction and installation
self-inspection report.
4 See Appendix J, for the main content of the building and operation self-
inspection report.
6.0.3 The content and depth of the safety acceptance evaluation report shall
meet the requirements of the current industry standard NB/T 31027 "Code for
preparation of safety assessment report upon completion of wind power
projects".
6.0.4 The preparation of acceptance materials shall be organized by the project
owner. The relevant units shall submit them on time, as required. The project
owner shall check the completeness and standardization of the sub...